After a construction break due to heavy rain most of the protective covering and the pool liner were laid and the pipelines including the pump house were installed. The welding will be finished and the dock features will also be set up soon. Before the pool is filled with water the steps and the ladder (at the non-visible part of the pool) will be installed.