The Biotop Natural Pool
German Version
German Version French version French version Imprint
Partner Login
 
<< back   

Klicken Sie das Bild für eine vergrößerte Ansicht!

Radnig Natural Pool

The local population was so enthused about the idea that they even helped with the renovation work.

Key Facts:

Year of Construction: 1994

Water Surface:
-
Swimming Area: 620 m2
-
Regeneration Zone incl.
   Plant Filter:
670 m2
-
Total: 1.290 m2

Water Depth: max. 2,5 m

Technical Equipment:
-
Plant Filter: 120 m2
- Number of Pumps: 2
-
Number of Skimmers: 6

Construction commissioned of
Community of Hermagor
A-9620 Hermagor (AUT)

Operator
Verein Naturschwimmbad Radnig
A-9620 Hermagor, Radnig 71
Obmann Ing. Heinrich Walker
www.hermagor.at

Planning & Implemantation:
Biotop GmbH

Description:

As the old swimming pool no longer met technical and hygienic demands, in 1993 the town council decided to convert the outdoor pool into a Natural Pool.
The existing pool was expanded to twice the original size and an equally large regeneration zone was added. A water filter and a shallow water area for small children was built, the cement surfaces were replaced with wooden docks and the snack bar building was renovated. The situation since the opening in 1994 has been very positive. The number of guests compared to the former swimming pool has risen by approximately 30 percent. Operating costs are covered, which means there are no further costs for the town council. The Radnig Natural Pool has become an "in" meeting place and keeps its snack bar open all year round. In wintertime the frozen surface is used for alpine curling and ice skating.
   
<< Public Natural Pools

 

Swimming-Teich - a Product of
Landschaftsgestaltung Ges. m.b.H.
Biotop Landschaftsgestaltung Gesellschaft m.b.H., A- 3411 Klosterneuburg-Weidling, Hauptstrasse 285, Tel.: +43 (0)2243-304 06
 
Webdesign by berghWerk