The Biotop Natural Pool
German Version
German Version French version French version Imprint
Partner Login
 
<< back   
Click on the image for a larger view.

Campingplatz am Bauernhof
(Camping site at the farm)

 
Margret Kramer:
“All the samples the health authorities took were ok. It was definitely a good decision to build the pool despite all resistance.”
Key Facts:

Year of Construction: 2003

Water Surface:
- Swimming Area: 400 m²
- Regeneration Zone incl. Plant Filter: 400 m²
- Children Swimming Section: 100m²
- Total: 900 m²

Water Depth: 2.00 m

Technical Equipment:
- Plant Filter: 200 m²
- Biotop-Carbonators: 1
- Number of Pumps: 1
- Number of Skimmers: 2

Owner and Operator:
Camping am Bauernhof
Familie Kramer
St. Georg-Strasse 8
D-88094 Oberteuingen/Neuhaus
Germany
Tel. +49/(0)7528/24 46
Fax +49/(0)7546/91 81 06
Email: kramer@camping-am-bauernhof.de
www.camping-am-bauernhof.de

Planning & Implementation:
Fa. Haas GmbH & CoKG
Hochbergweg 4
D-88239 Wangen-Roggenzell
Germany
Tel. +49/(0)7528/958
Fax +49/(0)7528/958-30
Email: info@haas-galabau.de
www.haas-galabau.de

Description:

Margret and Rudi Kramer‘s “Campingplatz am Bauernhof“(Camping site at the farm) is situated about ten kilometres away from Lake Constance. Even though the next public pool is not more than five kilometres away, the guests said that a pool was kind of missing and that it would make the camping site perfect.

Back then there was no legal foundation or guidelines, nor any models for such a pool on other camping sites in the region. Therefore the local authorities were not really sure what to do about that. It took two years before the project was finally approved and in spring 2003 the planning and construction could eventually start.

Within only three months the Haas Company transformed the basin that was formerly used to produce ice into a 900 m² large, idyllic natural pool. Due to module construction the framework was quickly built with corner elements separating the swimming area from the regeneration zone and made it possible for the owner to do several things the way he wanted them done. He also carried out the excavation works according to precise excavation plans himself. The approximately 100 m² big children swimming section with an artificial sandy beach is particularly attractive for the smaller ones. In the meantime there are legal guidelines for a pool construction. However, this pool has become a model that serves for many other camping sites.

<< Natural Pools for Hotels

 

Swimming-Teich - a Product of
Landschaftsgestaltung Ges. m.b.H.
Biotop Landschaftsgestaltung Gesellschaft m.b.H., A- 3411 Klosterneuburg-Weidling, Hauptstrasse 285, Tel.: +43 (0)2243-304 06
 
Webdesign by berghWerk